PORTFOLIO

Dalata Hotels

 

Total Fitout were the residential fit out contractor for the former Quality Hotel in Cardiff Lane in Dublin’s Docklands and The Maldron Hotel in Arena, Tallaght. Both projects were taken from initial design presentation, scoping and subsequent delivery to a fast track and discerning standard.

 

Quality Hotel Dublin Docklands (now Clayton Hotel)

The fit out works were completed in conjunction with Elliott Group and consisted of 320 bedrooms (Phase 1 & 2) fitted out to a 3 star plus standard. All works were completed in record time and handed over to the operator without a glitch.

 

Maldron Hotel Tallaght

This project consisted of the turnkey fit out of the hotel’s 120 bedrooms in conjunction with Elliott Group. The scope was to provide everything from the furniture to the linen! All rooms were opened on time for the opening date and the operators were very pleased with the standard and service provided.

 

GET IN TOUCH

Address: Ballyhaise Road, Latt, Cavan, H12 H155, Rep. Of Ireland

Address: 27 St. James' Walk, Herberton, Rialto, Dublin 8, D08 VP95,  Rep. of Ireland

E-mail: info@totalfitout.com

Phone: +353 49 438 0204 / +353 87 617 7481

Web Design By Coppertree.ie

 

Copyright Total Fitout 2015.